Reserve Fund Study Cost — Commercial Properties in Alberta

Transparent pricing for commercial Reserve Fund Studies in Alberta — base fee, per-bay tiers, age adjustment, travel multiplier, and GST.

Need a Reserve Fund Study in Edmonton?

Brookstone Engineering is a reserve fund study provider with in-house APEGA-licensed Professional Engineers (P.Eng.). Request a Reserve Fund Study Quote Edmonton

Brookstone quotes every commercial Reserve Fund Study as a single transparent fixed fee — no hourly billing, no surprise add-ons. Boards receive a written proposal showing Subtotal + 5% GST = Total before any work begins.

What drives the price

Every commercial property is different. Your fixed-fee proposal is scoped against the specifics of your plan:

  • Property type — retail strata, industrial / warehouse bays, office or professional condos, mixed-use, or bare-land commercial
  • Unit or bay count — larger inventories take more time to inspect, photograph, and document
  • Building age and condition — older assets require more in-depth component evaluation and documentation review
  • Location and travel distance — Edmonton, Calgary, Red Deer, and surrounding regions each carry different on-site requirements
  • Multi-building scope — complexes with more than one building involve additional inspection scope
  • Document availability — drawings, prior studies, and maintenance records affect the depth of field verification needed
  • Mixed-use shared-component allocation — apportioning roof, façade, parking, and structure between commercial and residential portions

What is always included

Every commercial engagement delivers the full Brookstone deliverable — no tiered packages, no upsells:

  • APEGA-sealed PDF report
  • Full component inventory and condition assessment
  • 30-year cash-flow projection
  • Multiple funding scenarios (current contribution, target-funded, special-assessment alternatives)
  • GST-inclusive and GST-exclusive cost tables to support tenant chargebacks and capital-cost-allowance accounting
  • Draft review revisions before the report is finalized
  • AGM-ready executive summary

What is never extra

  • No separate fee for the site inspection
  • No hourly add-ons for routine questions, calls, or revisions during the engagement
  • No charge for GST or mixed-use disclosure tables
  • No surprise line items between proposal and final invoice

How to get a number

Pricing is property-specific by design — there is no public rate card. Tell us about your commercial condo plan and we will respond with a fixed-fee proposal within 1 business day.

Request a reserve fund study proposal.

Request a quote for a Reserve Fund Study from Brookstone Engineering.

Related resources