Overview
Need a Reserve Fund Study in Edmonton?
Brookstone is an engineering firm and reserve fund study provider with in-house APEGA-licensed Professional Engineers (P.Eng.). Request a Reserve Fund Study Quote (Edmonton)
Complete breakdown of deliverables, from document review through post-delivery support. Understand exactly what you're getting from a professional study.
Document Review Phase
A comprehensive Reserve Fund Study begins with thorough review of your corporation's documents. This phase establishes context and informs the engineering assessment.
- Governing documents: Bylaws, condominium plan, rules defining common property
- Previous studies: Prior Reserve Fund Studies and any interim updates
- Financial records: Current budget, reserve fund balance, contribution history
- Maintenance records: Service contracts, repair history, warranty claims
- Building plans: Architectural drawings, mechanical/electrical specifications
- Insurance documents: Current policy, recent appraisals, claims history
- Board minutes: Relevant decisions about capital projects or maintenance
Site Inspection Components
A licensed P.Eng. conducts comprehensive on-site inspection of all common property components. This visual assessment forms the foundation of condition ratings and remaining useful life estimates.
- Building envelope: Roof systems, exterior cladding, windows, doors, balconies
- Structural elements: Foundation, load-bearing walls, parking structures
- Mechanical systems: HVAC, plumbing, fire suppression, elevators
- Electrical systems: Service entrance, distribution, emergency lighting, generators
- Interior finishes: Common area flooring, ceilings, walls, fixtures
- Site elements: Paving, landscaping, fencing, exterior lighting, drainage
- Amenity spaces: Pool, fitness room, party room, guest suites
Component Inventory & Assessment
Every major building component is cataloged with detailed information supporting funding calculations. This inventory becomes the backbone of your capital planning.
- Component identification: Description and location of each major element
- Quantity takeoffs: Measurements and counts for accurate costing
- Current condition: Assessment using standardized rating scales (1-5 or Good/Fair/Poor)
- Effective age: Actual vs. expected deterioration based on maintenance
- Remaining useful life: Engineering estimate of years until replacement
- Replacement method: Full replacement vs. major repair vs. refurbishment
Financial Projections & Modeling
Engineering data feeds into detailed financial models projecting costs and funding needs over the study period. Multiple scenarios help boards understand options.
- Current replacement costs: Present-day costs based on local market data
- Inflation projections: Cost escalation over 30+ year study period
- Expenditure timing: Year-by-year projection of when costs will occur
- Cash flow modeling: Annual contributions vs. expenditures over time
- Scenario analysis: Multiple funding strategies compared
- Percent funded calculation: Current reserves vs. fully funded balance
Funding Recommendations
Based on engineering assessment and financial modeling, the study provides specific recommendations for reserve fund contributions. These recommendations help boards make informed decisions.
- Recommended annual contribution: Dollar amount per unit or total
- Contribution increases: Phased increases if current funding is inadequate
- Funding strategy options: Different approaches with trade-offs explained
- Special assessment avoidance: Contributions needed to avoid future assessments
- Target funding level: Recommended percent funded goal (typically 70%+)
- Comparison to current practice: Gap analysis vs. current contributions
Final Report Contents
The deliverable is a comprehensive professional report documenting all findings, analysis, and recommendations. The report serves as your corporation's capital planning guide.
- Executive summary: Key findings and recommendations for board overview
- Property description: Building characteristics and common property scope
- Methodology: Explanation of assessment approach and assumptions
- Component inventory tables: Detailed listing with all assessment data
- Condition photos: Visual documentation supporting assessments
- Cash flow projections: Year-by-year tables and charts
- Funding recommendations: Clear guidance on contribution levels
- P.Eng. certification: Professional seal confirming study validity
To see how this scope applies to your property, get a reserve fund study quote that sets out the full scope for your building.
Post-Delivery Support
Quality providers don't disappear after delivering the report. Post-delivery support helps boards understand and implement recommendations effectively.
- Question period: Availability to answer board questions about findings
- Board presentation: Optional presentation to explain study and answer questions
- Implementation guidance: Help understanding how to apply recommendations
- Clarifications: Explanation of technical terms or methodology
- Future reference: Availability for questions as board implements recommendations
- Update planning: Guidance on when next study should be conducted
We provide reserve fund studies that meet Alberta condominium reserve fund study requirements. Service areas include Reserve Fund Study Edmonton, Reserve Fund Study Calgary, and Reserve Fund Study Red Deer.